dc.description.abstractThe operation schedule of the power generation units in electrical power systems is determined by the optimisation problem known as unit commitment (UC), aiming at minimising the total cost considering the generation constraints. To obtain a feasible solution from the network perspective, the security-constrained UC (SCUC) problem has been defined to embed the network constraints in the optimisation problem as well. Also, the higher penetration of renewable energy sources (RES) has increased the difficulty of UC problem, mainly due to the uncertainty and the high variability of RES. This paper proposed a SCUC with economic dispatch (SCUCED) optimisation developed in two stages. The first one is the solution of a merit-order based zonal day-ahead market (ZDAM) optimisation to define a preliminary generation schedule. In the second stage, the SCUCED is solved based on AC load flow routines and sensitivity factors to embed the full network representation. The approach is applied to a modified version of the IEEE 39-bus test system.en_US
dc.identifier.citationTricarico G, Azuara-Grande LS, Wagle R, Gonzalez-Longatt FGL, Dicorato M, Forte G, Rueda JL: Security Constrained Unit Commitment and Economic Dispatch applied to the Modified IEEE 39-bus system Case. In: IECON 2022. IECON 2022 – 48th Annual Conference of the IEEE Industrial Electronics Society, 2022. IEEE (Institute of Electrical and Electronics Engineers) p. 1-5en_US
dc.identifier.cristinIDFRIDAID 2102933
dc.identifier.doi10.1109/IECON49645.2022.9968474
dc.identifier.isbn978-1-6654-8025-3
dc.identifier.issn1553-572X
dc.identifier.issn2577-1647
dc.identifier.urihttps://hdl.handle.net/10037/28830
dc.language.isoengen_US
dc.publisherIEEEen_US
dc.rights.accessRightsopenAccessen_US
dc.rights.holderCopyright 2022 The Author(s)en_US
dc.rights.urihttps://creativecommons.org/licenses/by/4.0en_US
dc.rightsAttribution 4.0 International (CC BY 4.0)en_US
dc.titleSecurity Constrained Unit Commitment and Economic Dispatch applied to the Modified IEEE 39-bus system Caseen_US
dc.type.versionacceptedVersionen_US
dc.typeJournal articleen_US
dc.typeTidsskriftartikkelen_US


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution 4.0 International (CC BY 4.0)
Med mindre det står noe annet, er denne innførselens lisens beskrevet som Attribution 4.0 International (CC BY 4.0)