Show simple item record

dc.contributor.authorAndersen, Kristian G
dc.contributor.authorCalviani, Marco
dc.contributor.authorCherif, Ahmed
dc.contributor.authorCoiffet, Thibaut
dc.contributor.authorDe Macedo, Aurelio
dc.contributor.authorDevidal, Sylvain
dc.contributor.authorGeisser, Jean-Marie
dc.contributor.authorGilardoni, Simone S
dc.contributor.authorGillet, Martin
dc.contributor.authorGrenier-Boley, Edouard
dc.contributor.authorHeredia, Jorge
dc.contributor.authorMajbour, Abdelhabib
dc.contributor.authorMonnet, Franck
dc.contributor.authorMonteserin, Manuel Redondas
dc.contributor.authorNuiry, Francois-Xavier
dc.contributor.authorPugnat, Dominique
dc.contributor.authorRomagnoli, Giulia
dc.contributor.authorSeraphin, Yann
dc.contributor.authorSomoza, Jose
dc.contributor.authorThaus, Nicolas
dc.date.accessioned2023-10-03T09:24:29Z
dc.date.available2023-10-03T09:24:29Z
dc.date.issued2021-08-26
dc.description.abstractIn the framework of the CERN Large Hadron Collider Injectors Upgrade (LIU) Project, the Proton Synchrotron (PS) has been equipped with two new movable Internal Dumps (PSID), each of them capable of absorbing particle beams of an energy of up to 100 kJ. These dumps replace the old Internal Dumps, which have been operated in the accelerator complex since their installation in 1975 until their decommissioning and removal from the machine during the second LHC Long Shut down (LS2). This contribution will address the construction and testing phases of the new PSIDs, including the assembly of the dump core, its actuation system and the respective shielding, mechanical running-in tests, metrology adjustments, Ultra-High Vacuum (UHV) and impedance acceptance tests. The described installation work was completed successfully, and the new generation Dumps are currently operational in the PS machine.en_US
dc.descriptionSource at <a href=https://inspirehep.net/literature/1961952>https://inspirehep.net/literature/1961952</a>.en_US
dc.identifier.citationAndersen, Calviani, Cherif, Coiffet, De Macedo, Devidal, Geisser, Gilardoni, Gillet, Grenier-Boley, Heredia, Majbour, Monnet, Monteserin, Nuiry, Pugnat, Romagnoli, Seraphin, Somoza, Thaus: Construction and Installation of the New CERN Proton Synchrotron Internal Beam Dumps. In: Liu L. Proceedings of the 12th International Particle Accelerator Conference , 2021. JACoW Publishingen_US
dc.identifier.cristinIDFRIDAID 2103530
dc.identifier.isbn978-3-95450-214-1
dc.identifier.urihttps://hdl.handle.net/10037/31394
dc.language.isoengen_US
dc.publisherJACoWen_US
dc.rights.accessRightsopenAccessen_US
dc.rights.holderCopyright 2021 The Author(s)en_US
dc.rights.urihttps://creativecommons.org/licenses/by/4.0en_US
dc.rightsAttribution 4.0 International (CC BY 4.0)en_US
dc.titleConstruction and Installation of the New CERN Proton Synchrotron Internal Beam Dumpsen_US
dc.type.versionpublishedVersionen_US
dc.typeChapteren_US
dc.typeBokkapittelen_US


File(s) in this item

Thumbnail

This item appears in the following collection(s)

Show simple item record

Attribution 4.0 International (CC BY 4.0)
Except where otherwise noted, this item's license is described as Attribution 4.0 International (CC BY 4.0)