ub.xmlui.mirage2.page-structure.muninLogoub.xmlui.mirage2.page-structure.openResearchArchiveLogo
    • EnglishEnglish
    • norsknorsk
  • Velg spraakEnglish 
    • EnglishEnglish
    • norsknorsk
  • Administration/UB
View Item 
  •   Home
  • Fakultet for ingeniørvitenskap og teknologi
  • Institutt for industriell teknologi
  • Artikler, rapporter og annet (industriell teknologi)
  • View Item
  •   Home
  • Fakultet for ingeniørvitenskap og teknologi
  • Institutt for industriell teknologi
  • Artikler, rapporter og annet (industriell teknologi)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A Co-Scheduling Problem of Ship Lift and Ship Lock at the Three Gorges Dam

Permanent link
https://hdl.handle.net/10037/18916
DOI
https://doi.org/10.1109/ACCESS.2020.3009775
Thumbnail
View/Open
article.pdf (7.356Mb)
Published version (PDF)
Date
2020-07-16
Type
Journal article
Tidsskriftartikkel
Peer reviewed

Author
Zhao, Xu; Lin, Qianjun; Yu, Hao
Abstract
Due to the unprecedentedly increasing demands of waterway transportation on the Yangtze River during the latest years, traffic congestion at the Three Gorges Dam (TGD) has becoming a serious problem. In busiest seasons, a vessel may need to wait up to 3 days for passing the TGD via the ship lift or the five-stage ship lock. In order to improve the navigation efficiency and the utilization of passing facilities, a co-scheduling problem of ship lift and ship lock at the TGD is modeled in this paper. Besides, the improvement on effectiveness, safety and fairness of the navigation scheduling by introducing the ship lift is taken into account. The mathematical model proposed is, by nature, a two-stage problem, where the first-stage variables determine the assignments of passing facilities and the second-stage variables schedule the vessels. In order to solve the proposed mathematical model, a hybrid metaheuristic algorithm is used at the first stage to determine the allocation of vessels to different passing facilities and to different lockage through the maximization of facility utilization rate. The second-stage problem is then solved by CPLEX. The proposed mathematical model and algorithm are validated through a set of numerical experiments and a case study. The results show both the navigation efficiency and the utilization of passing facilities can be improved by using the proposed methods.
Publisher
IEEE
Citation
Zhao X, Lin Q, Yu H. A Co-Scheduling Problem of Ship Lift and Ship Lock at the Three Gorges Dam. IEEE Access. 2020;8:132893-132910
Metadata
Show full item record
Collections
  • Artikler, rapporter og annet (industriell teknologi) [195]
Copyright 2020 The Author(s)

Browse

Browse all of MuninCommunities & CollectionsAuthor listTitlesBy Issue DateBrowse this CollectionAuthor listTitlesBy Issue Date
Login

Statistics

View Usage Statistics
UiT

Munin is powered by DSpace

UiT The Arctic University of Norway
The University Library
uit.no/ub - munin@ub.uit.no

Accessibility statement (Norwegian only)