ub.xmlui.mirage2.page-structure.muninLogoub.xmlui.mirage2.page-structure.openResearchArchiveLogo
    • EnglishEnglish
    • norsknorsk
  • Velg spraakEnglish 
    • EnglishEnglish
    • norsknorsk
  • Administration/UB
View Item 
  •   Home
  • Fakultet for naturvitenskap og teknologi
  • Institutt for teknologi og sikkerhet
  • Artikler, rapporter og annet (teknologi og sikkerhet)
  • View Item
  •   Home
  • Fakultet for naturvitenskap og teknologi
  • Institutt for teknologi og sikkerhet
  • Artikler, rapporter og annet (teknologi og sikkerhet)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Simulation of peak tension loads in Subsea power cables during installation

Permanent link
https://hdl.handle.net/10037/23212
DOI
https://doi.org/10.1088/1757-899X/1201/1/012010
Thumbnail
View/Open
article.pdf (1.572Mb)
Published version (PDF)
Date
2021
Type
Journal article
Tidsskriftartikkel
Peer reviewed

Author
Okkerstrøm, Lene; Gudmestad, Ove Tobias; Pedersen, Egil
Abstract
At present, most of the insurance claims in the offshore wind industry are due to cable failures where a large percentage occurs during the installation of the array and export cables. As the reliability of the cables depends on the location and installation method, it is important to map the risks involved, which can compromise the cable's integrity in individual projects. This paper presents sensitivity analyses conducted on crucial parameters in the cable laying process, with an objective of successful installation of subsea power cables without any damages to the cable. The analyses focus on the peak tension loads with reference to key parameters as cable self-weight and laying geometry, as well as the cable deployment position on the installation vessel. Finite element analyses were conducted with both static forces and dynamic forces for irregular vessel motions, by the aid of the well-tested software OrcaFlex.
Publisher
IOP Publishing
Citation
Okkerstrøm, Gudmestad OT, Pedersen E. Simulation of peak tension loads in Subsea power cables during installation . IOP Conference Series: Materials Science and Engineering. 2021;1201(012010)
Metadata
Show full item record
Collections
  • Artikler, rapporter og annet (teknologi og sikkerhet) [361]
Copyright 2021 The Author(s)

Browse

Browse all of MuninCommunities & CollectionsAuthor listTitlesBy Issue DateBrowse this CollectionAuthor listTitlesBy Issue Date
Login

Statistics

View Usage Statistics
UiT

Munin is powered by DSpace

UiT The Arctic University of Norway
The University Library
uit.no/ub - munin@ub.uit.no

Accessibility statement (Norwegian only)