Show simple item record

dc.contributor.advisorJohannessen, Espen
dc.contributor.authorOmosanya, Hafeez Abolade Olav
dc.date.accessioned2021-12-13T10:31:05Z
dc.date.available2021-12-13T10:31:05Z
dc.date.issued2021-05-18
dc.description.abstractFast changeover is changing from one process or machine to another line, process, or machine to produce different products or services. Lean aims at reducing waste, improving productivity, and eliminating non-value-added activities to the customer. Whilst achieving sustained continual improvement in certain activities and process of an organization. This project focuses on implementing the methodologies used in lean to improve a manufacturing process that has a changeover, and integrate an AIV (Automated Intelligent Vehicle) with a tool platform or top module into the same process. After careful literature review and research, I was able to set up a process in the machining laboratory of ‘UiT Universitet i Norge, Narvik,’ that is of value to a customer. I identified the step with the need of a fast tool change and optimized the entire process using a software called Simul8. After running the simulation for a period of two weeks and doing some analysis for the processes, I achieved an optimal solution that ensures that all bottlenecks and buffers were eliminated. I also conducted a smooth flow of the process, improving productivity, efficiency, and reduction in changeover time.en_US
dc.identifier.urihttps://hdl.handle.net/10037/23358
dc.language.isoengen_US
dc.publisherUiT Norges arktiske universiteten_US
dc.publisherUiT The Arctic University of Norwayen_US
dc.rights.accessRightsopenAccessen_US
dc.rights.holderCopyright 2021 The Author(s)
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0en_US
dc.rightsAttribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0)en_US
dc.subject.courseIDINE-3900
dc.subjectProduction Management and Logisticsen_US
dc.subjectKeywords: Fast changeover, Lean Manufacturing, AIV (Automated Intelligent Vehicle), MiR100, Simul8en_US
dc.subjectVDP::Technology: 500::Mechanical engineering: 570::Production and maintenance engineering: 572en_US
dc.subjectVDP::Teknologi: 500::Maskinfag: 570::Produksjon og driftsteknologi: 572en_US
dc.titleFast changeovers using AIV and a tool platformen_US
dc.typeMaster thesisen_US
dc.typeMastergradsoppgaveen_US


File(s) in this item

Thumbnail
Thumbnail

This item appears in the following collection(s)

Show simple item record

Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0)
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0)