• Case study of a large-scale solar, wind and hydro power hybrid system in Skibotndalen, Troms 

      Ingebrigtsen, Karoline (Master thesis; Mastergradsoppgave, 2017-06-06)
      The power company Troms Kraft is interested in the feasibility of a large-scale hybrid system in Skibotndalen in Troms. There are two existing hydro power stations in the area, and this thesis concerns the addition of an electric solar power plant of 20 MW and a wind power plant of 21 MW to these stations. As measured solar radiation is not available for one whole year at the location, solarradiation ...