dc.contributor.author | Ying, Kuo-Ching | |
dc.contributor.author | Pourhejazy, Pourya | |
dc.contributor.author | Huang, Ya-Hsuan | |
dc.date.accessioned | 2023-09-26T06:15:58Z | |
dc.date.available | 2023-09-26T06:15:58Z | |
dc.date.issued | 2023-09-24 | |
dc.description.abstract | This article contributes to the additive manufacturing-based production planning literature by developing a
Mixed-Integer Linear Programming (MILP) formulation for the Identical Parallel 3D-Printing Machines Scheduling Problem considering batching, multiple build platforms of restricted sizes, and sequence-independent setup
times. Besides, a customized metaheuristic, named the Tailored Iterated Greedy (TIG) Algorithm is developed to
solve the new optimization problem. TIG’s performance is evaluated through extensive numerical analysis and
using a new testbed. It is shown that the customized computational mechanisms improve the optimization
performance; statistical analysis is supportive of the significance of the resulting improvements. The developed
mathematical model and optimization algorithm can be considered the basis for future developments in the
optimization literature of additive manufacturing. | en_US |
dc.identifier.citation | Ying K, Pourhejazy P, Huang. Tailored Iterated Greedy metaheuristic for a scheduling problem in metal 3D printing. Advances in Engineering Software. 2023;186 | en_US |
dc.identifier.cristinID | FRIDAID 2178380 | |
dc.identifier.doi | 10.1016/j.advengsoft.2023.103546 | |
dc.identifier.issn | 0965-9978 | |
dc.identifier.issn | 1873-5339 | |
dc.identifier.uri | https://hdl.handle.net/10037/31201 | |
dc.language.iso | eng | en_US |
dc.publisher | Elsevier | en_US |
dc.relation.journal | Advances in Engineering Software | |
dc.rights.accessRights | openAccess | en_US |
dc.rights.holder | Copyright 2023 The Author(s) | en_US |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0 | en_US |
dc.rights | Attribution 4.0 International (CC BY 4.0) | en_US |
dc.title | Tailored Iterated Greedy metaheuristic for a scheduling problem in metal 3D printing | en_US |
dc.type.version | publishedVersion | en_US |
dc.type | Journal article | en_US |
dc.type | Tidsskriftartikkel | en_US |
dc.type | Peer reviewed | en_US |