Show simple item record

dc.contributor.authorYing, Kuo-Ching
dc.contributor.authorPourhejazy, Pourya
dc.contributor.authorLin, Zhi-Rong
dc.date.accessioned2025-04-23T08:40:53Z
dc.date.available2025-04-23T08:40:53Z
dc.date.issued2025-04-09
dc.description.abstractThe role of setup times in production planning and control was recognised in the late 1960s. Since then, a growing number of scheduling problems have accounted for sequence-dependent setup time variables. This study aims to provide a systematic review of setup times in the short-term production planning literature, using an objective, algorithm-based approach. The Main Path Analysis (MPA) and Cluster Analysis (CA) methods are employed to identify patterns of knowledge development and the most significant advancements in the field. Over 2100 articles published between 1986 and 2024 were considered in the review. The seminal articles contributing to the advances in setup times for production scheduling are reviewed. Meanwhile, the core optimisation technologies, model characteristics, and emerging issues at different stages of literature development are discussed. The key extensions of the main path are further explored to identify secondary research interests in the field. Twenty-two research themes were identified to provide an overall perspective and shed light on the technical features and challenges. Finally, future research directions are suggested based on the outcomes of this systematic review.en_US
dc.identifier.citationYing K, Pourhejazy P, Lin. Scheduling with Sequence-Dependent Setup Times in Short-Term Production Planning: A Main Path Analysis-Based Review. Operations Research Perspectives. 2025en_US
dc.identifier.cristinIDFRIDAID 2373242
dc.identifier.doihttps://doi.org/10.1016/j.orp.2025.100340
dc.identifier.issn2214-7160
dc.identifier.urihttps://hdl.handle.net/10037/36927
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.relation.journalOperations Research Perspectives
dc.rights.accessRightsopenAccessen_US
dc.rights.holderCopyright 2025 The Author(s)en_US
dc.rights.urihttps://creativecommons.org/licenses/by/4.0en_US
dc.rightsAttribution 4.0 International (CC BY 4.0)en_US
dc.titleScheduling with Sequence-Dependent Setup Times in Short-Term Production Planning: A Main Path Analysis-Based Reviewen_US
dc.type.versionpublishedVersionen_US
dc.typeJournal articleen_US
dc.typeTidsskriftartikkelen_US
dc.typePeer revieweden_US


File(s) in this item

Thumbnail

This item appears in the following collection(s)

Show simple item record

Attribution 4.0 International (CC BY 4.0)
Except where otherwise noted, this item's license is described as Attribution 4.0 International (CC BY 4.0)