ub.xmlui.mirage2.page-structure.muninLogoub.xmlui.mirage2.page-structure.openResearchArchiveLogo
    • EnglishEnglish
    • norsknorsk
  • Velg spraaknorsk 
    • EnglishEnglish
    • norsknorsk
  • Administrasjon/UB
Vis innførsel 
  •   Hjem
  • Fakultet for ingeniørvitenskap og teknologi
  • Institutt for industriell teknologi
  • Artikler, rapporter og annet (industriell teknologi)
  • Vis innførsel
  •   Hjem
  • Fakultet for ingeniørvitenskap og teknologi
  • Institutt for industriell teknologi
  • Artikler, rapporter og annet (industriell teknologi)
  • Vis innførsel
JavaScript is disabled for your browser. Some features of this site may not work without it.

A Co-Scheduling Problem of Ship Lift and Ship Lock at the Three Gorges Dam

Permanent lenke
https://hdl.handle.net/10037/18916
DOI
https://doi.org/10.1109/ACCESS.2020.3009775
Thumbnail
Åpne
article.pdf (7.356Mb)
Publisert versjon (PDF)
Dato
2020-07-16
Type
Journal article
Tidsskriftartikkel
Peer reviewed

Forfatter
Zhao, Xu; Lin, Qianjun; Yu, Hao
Sammendrag
Due to the unprecedentedly increasing demands of waterway transportation on the Yangtze River during the latest years, traffic congestion at the Three Gorges Dam (TGD) has becoming a serious problem. In busiest seasons, a vessel may need to wait up to 3 days for passing the TGD via the ship lift or the five-stage ship lock. In order to improve the navigation efficiency and the utilization of passing facilities, a co-scheduling problem of ship lift and ship lock at the TGD is modeled in this paper. Besides, the improvement on effectiveness, safety and fairness of the navigation scheduling by introducing the ship lift is taken into account. The mathematical model proposed is, by nature, a two-stage problem, where the first-stage variables determine the assignments of passing facilities and the second-stage variables schedule the vessels. In order to solve the proposed mathematical model, a hybrid metaheuristic algorithm is used at the first stage to determine the allocation of vessels to different passing facilities and to different lockage through the maximization of facility utilization rate. The second-stage problem is then solved by CPLEX. The proposed mathematical model and algorithm are validated through a set of numerical experiments and a case study. The results show both the navigation efficiency and the utilization of passing facilities can be improved by using the proposed methods.
Forlag
IEEE
Sitering
Zhao X, Lin Q, Yu H. A Co-Scheduling Problem of Ship Lift and Ship Lock at the Three Gorges Dam. IEEE Access. 2020;8:132893-132910
Metadata
Vis full innførsel
Samlinger
  • Artikler, rapporter og annet (industriell teknologi) [195]
Copyright 2020 The Author(s)

Bla

Bla i hele MuninEnheter og samlingerForfatterlisteTittelDatoBla i denne samlingenForfatterlisteTittelDato
Logg inn

Statistikk

Antall visninger
UiT

Munin bygger på DSpace

UiT Norges Arktiske Universitet
Universitetsbiblioteket
uit.no/ub - munin@ub.uit.no

Tilgjengelighetserklæring