Vis enkel innførsel

dc.contributor.authorAyele, Yonas Zewdu
dc.contributor.authorBarabadi, Abbas
dc.contributor.authorBarabady, Javad
dc.date.accessioned2016-03-03T10:30:10Z
dc.date.available2016-03-03T10:30:10Z
dc.date.issued2015-09-14
dc.description.abstractTimely delivery of the required spare parts plays an important role in meeting the availability target and reducing the downtime of production facilities. Spare parts logistics is affected in complex ways while operating in the Arctic, since the area is sparsely populated and has insufficient infrastructure. It is also greatly affected by the distinctive operational environment of the region, such as cold temperature, varying forms of sea ice, blizzards, heavy fog, etc. Therefore, in order to have an effective logistic plan, the effect of all influencing factors, called covariates, on the transportation of the spare parts need to be identified, modelled and quantified by the use of an appropriate dynamic model. The traditional models, however, lack the comprehensive integration of the effect of covariates on the spare parts transportation. The purpose of this paper is to introduce the concept of a dynamic model for spare parts transportation in Arctic conditions by considering the time-independent and time-dependent covariates. The model continuously updates the prior probabilities according to the most recent time-dependent covariates to provide posterior probabilities. The application of the model is illustrated using a case study.en_US
dc.descriptionAccepted manuscript version. Published version at <a href=http://doi.org/10.1007/s13198-015-0379-x>http://doi.org/10.1007/s13198-015-0379-x</a>.en_US
dc.identifier.citationInternational Journal of Systems Assurance Engineering and Management 2015, 7(1):84-98en_US
dc.identifier.cristinIDFRIDAID 1266362
dc.identifier.doi10.1007/s13198-015-0379-x
dc.identifier.issn0976-4348
dc.identifier.urihttps://hdl.handle.net/10037/8630
dc.identifier.urnURN:NBN:no-uit_munin_8188
dc.language.isoengen_US
dc.publisherSpringer Verlag
dc.rights.accessRightsopenAccess
dc.subjectArcticen_US
dc.subjectproduction facilityen_US
dc.subjectspare partsen_US
dc.subjecttime-independent covariateen_US
dc.subjecttime-dependent covariateen_US
dc.subjecttransportationen_US
dc.subjectVDP::Technology: 500::Building technology: 530::Building, construction and transport technology: 532en_US
dc.subjectVDP::Teknologi: 500::Bygningsfag: 530::Bygg-, anleggs- og transportteknologi: 532en_US
dc.titleDynamic spare parts transportation model for Arctic production facilityen_US
dc.typeJournal articleen_US
dc.typeTidsskriftartikkelen_US
dc.typePeer revieweden_US


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel