ub.xmlui.mirage2.page-structure.muninLogoub.xmlui.mirage2.page-structure.openResearchArchiveLogo
    • EnglishEnglish
    • norsknorsk
  • Velg spraakEnglish 
    • EnglishEnglish
    • norsknorsk
  • Administration/UB
View Item 
  •   Home
  • Fakultet for naturvitenskap og teknologi
  • Institutt for teknologi og sikkerhet
  • Artikler, rapporter og annet (teknologi og sikkerhet)
  • View Item
  •   Home
  • Fakultet for naturvitenskap og teknologi
  • Institutt for teknologi og sikkerhet
  • Artikler, rapporter og annet (teknologi og sikkerhet)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Industrial Equipment’s Throughput Capacity Analysis

Permanent link
https://hdl.handle.net/10037/24859
DOI
https://doi.org/10.1007/978-3-030-93639-6_9
Thumbnail
View/Open
article.pdf (447.1Kb)
Accepted manuscript version (PDF)
Date
2022-01-01
Type
Journal article
Tidsskriftartikkel
Peer reviewed

Author
Barabadi, Abbas; Nouri, ali; Hazrati, Ali; Khodayari, Aliasqar; Mokhberdoran, Mahdi
Abstract
Throughput capacity (TC) is defined as the total amount of material processed or produced by the system in the given time. In practice, full capacity performance for industrial equipment is impossible because the failures are affected and cause a reduction. Therefore, failure interruptions, especially critical ones (bottlenecks), must be detected and considered in production management. From the point of production view, the bottleneck has the lowest production or performance. Most of the previous works used the availability and related importance measures as performance indicators and prioritization of subsystems. However, these measures cannot consider system production in their prioritization. This paper presents a bottleneck detection framework based on system performance and production capacity integration. The integrated approach is used to assess the loading and hauling subsystems of Golgohar Iron Mine, Iran. As a result of the analysis, the hauling subsystem identifies the system’s bottleneck.
Publisher
Springer
Citation
Barabadi A, Nouri a, Hazrati, Khodayari, Mokhberdoran M. Industrial Equipment’s Throughput Capacity Analysis. Lecture Notes in Mechanical Engineering. 2022:99-111
Metadata
Show full item record
Collections
  • Artikler, rapporter og annet (teknologi og sikkerhet) [361]
Copyright 2022 The Author(s)

Browse

Browse all of MuninCommunities & CollectionsAuthor listTitlesBy Issue DateBrowse this CollectionAuthor listTitlesBy Issue Date
Login

Statistics

View Usage Statistics
UiT

Munin is powered by DSpace

UiT The Arctic University of Norway
The University Library
uit.no/ub - munin@ub.uit.no

Accessibility statement (Norwegian only)